Öl-Projekt 88 Energy Project in der heißen Phase


Seite 63 von 235
Neuester Beitrag: 31.10.24 09:47
Eröffnet am:19.11.15 20:29von: Pd205Anzahl Beiträge:6.862
Neuester Beitrag:31.10.24 09:47von: lewwerworsc.Leser gesamt:2.025.893
Forum:Hot-Stocks Leser heute:1.158
Bewertet mit:
12


 
Seite: < 1 | ... | 60 | 61 | 62 |
| 64 | 65 | 66 | ... 235  >  

549 Postings, 2563 Tage TKoneCharlie-1 Appraisal Well Update 26.12.2019

 
  
    #1551
26.12.19 23:07

http://clients3.weblink.com.au/clients/_88energy/...eadlineid=6961042

Übersetzung ohne Gewähr:

27th December 2019
88 Energy Limited
Charlie-1 Appraisal Well Update
88 Energy Limited (ASX: 88E) (“88 Energy” or the “Company”) provides the following update related
to the upcoming drilling of the Charlie-1 appraisal well at Project Icewine, located on the Central North
Slope, Alaska.
Highlights
• Initial snow trail from Dalton Highway complete
• Ice road construction on track to commence within days
• Operational activity for Charlie-1 progressing to plan for February 2020 spud
Operations Update
The Nordic Rig 3 will exit the Dalton Highway approximately 20 miles south of Deadhorse before it
begins its 30-mile journey on an ice road to the Charlie-1 location. Construction is complete for the
initial snow trail to the first lake that will be utilised for building the ice road. Production of the ice road
itself is scheduled to commence prior to the end of 2019, weather permitting.
Everything is proceeding as planned ahead of the scheduled February 2020 spud date.
88 Energy Managing Director, Dave Wall commented: “It has been a successful year for the Company,
having matured part of the conventional potential at Project Icewine to the point of a farm-out that
makes a lot of sense for our shareholders. We are now on the cusp of drilling a potentially
transformational well, Charlie-1, in the first quarter of 2020 and are looking forward to a safe and
successful operation.”
About the Charlie-1 Appraisal Well
The Charlie-1 appraisal well has been designed as a step out appraisal of a well drilled in 1991 by BP
Exploration (Alaska) Inc called Malguk-1. Malguk-1 encountered oil shows with elevated resistivity
and mud gas readings over multiple horizons during drilling but was not tested due to complications
towards the end of operations, which resulted in lack of time before the close of the winter drilling
season. It was also drilled using vintage 2D seismic, which was insufficient to adequately determine
the extent of any of the prospective targets encountered.
88 Energy subsequently undertook revised petrophysical analysis, which identified what is interpreted
as bypassed pay in the Malguk-1 well. 88E also completed acquisition of modern 3D seismic in 2018,
in order to determine the extent of the discovered oil accumulations. Charlie-1 will intersect seven
stacked prospects, four of which are interpreted as oil bearing in Malguk-1 and are therefore
considered appraisal targets. 88 Energy will operate Charlie-1, via its 100% owned subsidiary
Accumulate Energy Alaska, Inc, with cost of the well to be funded by Premier Oil Plc up to US$23m
under a recent farm-out agreement. Drilling is scheduled to commence in February 2020 with flow
testing anticipated to conclude in April 2020. The total Gross Mean Prospective Resource across the
seven stacked targets to be intersected by Charlie-1 is 1.6 billion barrels of oil (480 million barrels net
to 88E). Refer announcement dated 23rd August.
Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the
application of a future development project relate to undiscovered accumulations. These estimates
have both an associated risk of discovery and a risk of development. Further exploration, appraisal
and evaluation are required to determine the existence of a significant quantity of potentially movable
hydrocarbons.

(...)  
Angehängte Grafik:
screenshot_20191226_230620.jpg (verkleinert auf 47%) vergrößern
screenshot_20191226_230620.jpg

549 Postings, 2563 Tage TKoneÜbersetzung ohne Gewähr

 
  
    #1552
26.12.19 23:10
27. Dezember 2019
88 Energy Limited
Charlie-1 Appraisal Well Update
88 Energy Limited (ASX: 88E) („88 Energy“ oder das „Unternehmen“) stellt das folgende Update zur Verfügung
zu den bevorstehenden Bohrungen des Charlie-1-Bewertungsbohrlochs bei Project Icewine im zentralen Norden
Hang, Alaska.
Höhepunkte
• Erste Schneestrecke vom Dalton Highway abgeschlossen
• Der Eisstraßenbau soll innerhalb weniger Tage beginnen
• Operationelle Aktivität für Charlie-1 verläuft nach Plan für Februar 2020
Operations Update
Das Nordic Rig 3 verlässt den Dalton Highway ungefähr 32 km südlich von Deadhorse
beginnt seine 30-Meilen-Reise auf einer Eisstraße zum Charlie-1-Standort. Die Bauarbeiten für das sind abgeschlossen
erster schneeweg zum ersten see, der für den bau der eisstraße genutzt wird. Herstellung der Eisstraße
Der eigentliche Beginn ist für Ende 2019 vorgesehen, sofern das Wetter dies zulässt.
Alles läuft wie geplant vor dem geplanten Starttermin im Februar 2020.
Dave Wall, Managing Director von 88 Energy, kommentierte: „Es war ein erfolgreiches Jahr für das Unternehmen,
einen Teil des konventionellen Potenzials bei Project Icewine bis zu einem Farmout ausgereift zu haben
macht für unsere aktionäre sehr viel sinn. Wir stehen jetzt kurz vor dem Bohren eines Potenzials
Transformation gut, Charlie-1, im ersten Quartal 2020 und freuen uns auf eine sichere und
erfolgreicher Betrieb. “
Über den Charlie-1-Beurteilungsbrunnen
Der Charlie-1-Beurteilungsbrunnen wurde als Einzelbeurteilung eines 1991 von BP gebohrten Brunnens konzipiert
Exploration (Alaska) Inc namens Malguk-1. Malguk-1 stieß auf Ölerscheinungen mit erhöhtem spezifischem Widerstand
und Schlammgaswerte über mehrere Horizonte während des Bohrens, wurden jedoch aufgrund von Komplikationen nicht getestet
gegen Ende des Betriebs, was zu Zeitmangel vor dem Ende der Winterbohrungen führte
Jahreszeit. Es wurde auch mit 2D-Seismik gebohrt, was nicht ausreichte, um dies angemessen zu bestimmen
das Ausmaß eines der potenziellen Ziele angetroffen.
88 Energy führte anschließend eine überarbeitete petrophysikalische Analyse durch, in der ermittelt wurde, was interpretiert wird
als Bypass im Malguk-1 gut bezahlen. 88E schloss die Akquisition der modernen 3D-Seismik 2018 ab.
um das Ausmaß der entdeckten Ölansammlungen zu bestimmen. Charlie-1 schneidet sieben
Gestapelte Aussichten, von denen vier in Malguk-1 als ölhaltig interpretiert werden und daher sind
Bewertungsziele berücksichtigt. 88 Energy wird Charlie-1 über seine 100% ige Tochtergesellschaft betreiben
Accumulate Energy Alaska, Inc, mit Kosten für die von Premier Oil Plc zu finanzierende Bohrung von bis zu 23 Mio. USD
im Rahmen einer kürzlich abgeschlossenen Farm-out-Vereinbarung. Die Bohrungen sollen im Februar 2020 mit Flow beginnen
Die Tests werden voraussichtlich im April 2020 abgeschlossen sein
Die sieben gestapelten Ziele, die Charlie-1 erreichen soll, sind 1,6 Milliarden Barrel Öl (480 Millionen Barrel netto)
bis 88E). Siehe Ankündigung vom 23. August.
Warnhinweis: Die geschätzten Erdölmengen, die möglicherweise von der EU gefördert werden
die anwendung eines zukünftigen entwicklungsprojekts betrifft unentdeckte akkumulationen. Diese Schätzungen
haben sowohl ein Risiko der Entdeckung als auch ein Risiko der Entwicklung. Weitere Erkundung, Bewertung
und eine Bewertung sind erforderlich, um das Vorhandensein einer signifikanten Menge potenziell beweglicher Gegenstände festzustellen
Kohlenwasserstoffe.  

549 Postings, 2563 Tage TKoneproactive news vom 27.12.2019

 
  
    #1553
27.12.19 08:47

https://www.google.de/amp/s/...estors.co.uk/companies/amp/news/909815

88 Energy PLC said work on ice road to appraisal well should start before 2020
2019-12-27 00:33:00
Drilling is scheduled to commence in February 2020 with flow testing anticipated to conclude in April 2020

88 Energy Limited (LON:88E, ASX: 88E) said the initial snow trail from Dalton Highway to the Charlie-1 appraisal well in Alaska is complete.

In an update issued on 26 December, the company said that construction of an ice road to the well, at Project Icewine on the Central North Slope, is on course to commence before the end of the year, weather permitting.

The Nordic Rig 3 will exit the Dalton Highway about 20 miles south of Deadhorse before it begins its 30-mile journey on an ice road to the Charlie-1 location.

Everything is proceeding as planned ahead of the scheduled February 2020 spud date.

“It has been a successful year for the company, having matured part of the conventional potential at Project Icewine to the point of a farm-out that makes a lot of sense for our shareholders. We are now on the cusp of drilling a potentially transformational well, Charlie-1, in the first quarter of 2020 and are looking forward to a safe and successful operation.” said Dave Wall. 88 Energy’s managing director.

Übersetzung ohne Gewähr:

88 Energy PLC gab bekannt, dass die Arbeiten an der Eisstraße bis zum Gutachten vor 2020 beginnen sollten
2019-12-27 00:33:00
Die Bohrungen sollen im Februar 2020 beginnen, wobei die Flusstests voraussichtlich im April 2020 abgeschlossen sein werden

88 Energy Limited (LON: 88E, ASX: 88E) gab bekannt, dass der erste Schneeweg vom Dalton Highway zum Charlie-1-Bohrloch in Alaska vollständig ist.

In einem am 26. Dezember veröffentlichten Update teilte das Unternehmen mit, dass der Bau einer Eisstraße zum Brunnen im Projekt Icewine an der Central North Slope, je nach Wetterlage, noch vor Jahresende beginnen soll.

Das Nordic Rig 3 wird etwa 32 km südlich von Deadhorse vom Dalton Highway abfahren, bevor es seine 30-Meilen-Reise auf einer Eisstraße zum Charlie-1-Standort beginnt.

Alles läuft wie geplant vor dem geplanten Starttermin im Februar 2020.

„Es war ein erfolgreiches Jahr für das Unternehmen, das einen Teil des konventionellen Potenzials bei Project Icewine bis zu einem für unsere Aktionäre sehr sinnvollen Farm-Out ausgereift hat. Wir sind jetzt kurz davor, im ersten Quartal 2020 eine potenzielle Transformationsquelle, Charlie-1, zu bohren, und freuen uns auf einen sicheren und erfolgreichen Betrieb. “, Sagte Dave Wall. 88 Geschäftsführer von Energy.  

1081 Postings, 4787 Tage lewwerworschtsieht

 
  
    #1554
27.12.19 10:44
so schlecht nicht aus in London :-) !!

Freue mich auf 2020 und hoffe auf extremely good News seitens 88 Energy, es ist angerichtet !

Allen einen guten Start ins neue Jahr !  

359 Postings, 2523 Tage Ribald_TauschmannToll, rauf und runter

 
  
    #1555
27.12.19 18:06
mal 25% + dann wieder +-0 und ich sage mir jedes mal: "hätte ich verkauft, (denn es geht eh immer so), hätte ich jedes mal 25% mehr Anteile hinterher ... " .  

549 Postings, 2563 Tage TKone@Ribald_Tauschmann

 
  
    #1556
2
27.12.19 18:58
Wo ist dein Problem? Dass die Aktie schwankt, ist absolut normal. Niemand hält dich auf auf Daytraiding zu machen und sportlich zu kaufen und zu verkaufen. Bitte berücksichtige aber bei diesen Schwankungen, dass du Kaptialertragssteuer, Soli und Gebühren jedes Mal blechen musst. Da wird es interessant wie du jedes Mal 25 Prozent mehr Aktien erwerben willst.

Und plötzlich rennst du dem Kurs hinterher und holst ihn nicht mehr ein. 88E ist etwas für Geduldige! Die Schwankungen sind irrelevant!

Allen Investierten wünsche ich viel Erfolg!  

4244 Postings, 4289 Tage MoneyplusZumal

 
  
    #1557
3
27.12.19 19:11
wir in London mit schönen + 4,65 % geschlossen haben.

Was die MM`s hier auf den deutschen Handelsplätzen taxen (mit unterirdischem Spread) kann man  DERZEIT noch vergessen.

Da lohnt nur Daytrading in London oder der ASX. Jedoch nichts für mich.

Ich warte auf das Öl und dann kommt der Kurs von ganz alleine  :-))))  (und der Spread wird dann auch zivilisierter)  

2955 Postings, 5525 Tage bindabeialles steht auf Grün

 
  
    #1558
2
27.12.19 19:45
sie stehen kurz davor zu bohren nicht nur das hier wird einiges an Öl erwartet ,von daher gehe ich scher davon aus das wir spätestens im Febr auf 0,02  stehen alles andere würde mich sehr wundern.  

1081 Postings, 4787 Tage lewwerworscht0,03

 
  
    #1559
2
27.12.19 20:42
Würde ich auch nehmen ;-)  

3643 Postings, 1851 Tage Aktiensammler12Grüss

 
  
    #1560
30.12.19 10:24
Euch, an welcher Börse in welcher Währung handelt Ihr die Aktie? Danke schon mal...  

4568 Postings, 7257 Tage bradettiAlso ich agiere

 
  
    #1561
30.12.19 10:49
hier immer über Tradegate. Ist von den Transaktionskosten ganz ok und wird auch immer sofort ausgeführt.  

359 Postings, 2523 Tage Ribald_Tauschmann@Bradetti

 
  
    #1562
30.12.19 11:04
Guten Morgen,

daraus schließe ich, dass du die Aktie tradest? ;)  

4568 Postings, 7257 Tage bradettiNee,

 
  
    #1563
30.12.19 11:08
aber über 4 Jahre in 88E hat es schon den einen oder anderen Verkauf und natürlich einige Nachkäufe gegeben. Traden lohnt sich hier über deutsche Handelsplätze nicht. Dafür sind die Taxen hier viel zu starr.  

3643 Postings, 1851 Tage Aktiensammler12Mein

 
  
    #1564
30.12.19 11:27
Broker bietet mir nur ASX oder LSE an. Wobei der Kurs bei ASX rund 0.02 beträgt und bei LSE 1.12
Ich nehme an es handelt sich um AUD und britische Pence?
Mit welchem Kürzel handelt Ihr? Ich habe 88E, vielleicht bräuchte ich nur ein anderes Kürzel für tradegate?  

4568 Postings, 7257 Tage bradettiMit der WKN

 
  
    #1565
30.12.19 12:27
A14PRT sollte Tradegate doch was anfangen können!?  

2955 Postings, 5525 Tage bindabeiMoin zusammen

 
  
    #1566
30.12.19 13:32
wobei Trade  etwas günstiger angeboten  wird als in London 1,171 GBp - 0,013 EUR  

1081 Postings, 4787 Tage lewwerworschtLäuft

 
  
    #1567
30.12.19 14:06
Zum Jahresabschluss in London nochmal gut nach oben!!

Auf ein legendäres 2020 für 88 E.  :-)) !!  

3643 Postings, 1851 Tage Aktiensammler12Schön

 
  
    #1568
30.12.19 15:38
Und ich könnte mich in den Hintern beissen da ich einfach nicht zeichnen kann.

Kann mir jemand einen Broker empfehlen bei dem ich solche Aktien unkompliziert zeichnen kann? Gibt's ja nicht dass bei tradegate gezeichnet werden könnte und ich soll in Australien?
Ein Zweitdepot muss her.  

2955 Postings, 5525 Tage bindabeizu Aktiens. kein Beinbruh

 
  
    #1569
30.12.19 16:13
kannst in aller  Ruhe in Australien ordern ist umgerechnet der gleiche Kurs siehe hier AUD 0,0210 - EUR 0,0131 ,ok die Gebühren liegen etwas höher ,ansonsten ING  

3643 Postings, 1851 Tage Aktiensammler12O.k.,

 
  
    #1570
30.12.19 16:22
Danke... Australien ist scheinbar schon im Sylvesterfeeling. Egal, dann nächstes Jahr  

549 Postings, 2563 Tage TKoneAction zum Jahresende

 
  
    #1571
1
30.12.19 18:43
Mensch, nach Tagen der Stille ist hier im Forum zum Jahresende richtig viel los. :-)

Auf viele gute News in 2020 und einen steilen Anstieg!  
Angehängte Grafik:
screenshot_20191230_183949.jpg (verkleinert auf 30%) vergrößern
screenshot_20191230_183949.jpg

4244 Postings, 4289 Tage Moneyplusvor allem

 
  
    #1572
2
30.12.19 18:48
mit richtig gutem Volumen.

Alleine an der LSE heute über 56 Mio. Shares gehandelt  :-)   und Kursplus 4,44 %

NICE  

549 Postings, 2563 Tage TKoneGeil!

 
  
    #1573
30.12.19 19:19
88 Energy fly me to the moon! ;-)  
Angehängte Grafik:
screenshot_20191230_191757.jpg (verkleinert auf 26%) vergrößern
screenshot_20191230_191757.jpg

2955 Postings, 5525 Tage bindabeidas nennt man warm laufen,

 
  
    #1574
1
30.12.19 19:59
vor den grossen Run  Anfang des neuen Jahres ,der Kurs wird hier deshalb steigen weil  es hier bei 88 Energy nachweislich vorwärts geht und nicht rumgeeiert wird.  

2955 Postings, 5525 Tage bindabeiGuten Morgen, das sieht doch gut aus in Australia

 
  
    #1575
1
31.12.19 08:05

[Australian Securities Exchange] (20min delay)
Trade with IG
Advertisement
Last
2.2¢ Change
0.001(4.76%) Mkt cap
!
$144.3M
Open High Low Value Volume
2.1¢ 2.2¢ 2.1¢ $204.6K 9.461M
Buyers (Bids)
No. Vol. Price($)
12 17227566 2.1¢

Sellers (Offers)
Price($) Vol. No.
2.2¢ 2679838 18  

Seite: < 1 | ... | 60 | 61 | 62 |
| 64 | 65 | 66 | ... 235  >  
   Antwort einfügen - nach oben