Da geht bald die Post ab WKN: 898464
Achtung am Donnerstag ist ja Hauptversammlung, da werden bestimmt nicht nur Zahlen präsentiert! Also abwarten...noch 2 Tage! Bis dahin schön einkaufen! :-))))
TVC - V 5.0 0.455 · 0.49 32.0 0.49 +0.08 19.5 191.3 82 23 0.41 0.49 0.40 0.58 0.21 Feb 10 14:34 Feb 03
Gruß joker
Bin mal gespannt auf den Umsatz heute, würde mich nicht wundern wenn sich kurz vor Schluß noch einige eindecken.
Gruß Hakybaby
FOR: TOURNIGAN GOLD CORPORATION
TSX VENTURE SYMBOL: TVC
FRANKFURT, BERLIN SYMBOL: TGP
FEBRUARY 11, 2004 - 16:05 ET
Tournigan Gold Corporation: Revised Mineral Resource
Estimate at Kremnica
VANCOUVER, BRITISH COLUMBIA--Tournigan Gold Corporation
(" Tournigan" ) has received an independent resource calculation
for the Kremnica gold deposit which highlights the following:
- Higher Grade
- Increase in Indicated Resources
A National Instrument 43-101 Technical Report was independently
prepared using existing data on Kremnica, a historic mining camp
in the Slovak Republic that Tournigan acquired in July 2003. The
resource calculation focuses exclusively on the Sturec Zone,
historically the zone of greatest gold production at Kremnica. A
comparison of Sturec gold resources are as follows:
/T/
--------------------------------------------------
Sturec - Indicated Resources
----------------------------
Gold Silver
Cut-off Grade, Grade, Ounces, Ounces,
Grade (g/t) (g/t) (g/t) Tonnes Gold Silver
New Estimate, 2004
--------------------------------------------------
1.0 2.11 15.43 5,663,941 384,231 2,809,802
0.5 1.49 11.46 9,820,697 470,457 3,618,412
Prior Estimate, 1998 by WSE (see below)
--------------------------------------------------
1.0 1.83 14.2 2,652,000 156,227 1,211,183
0.5 1.51 11.9 3,655,000 177,687 1,396,228
--------------------------------------------------
--------------------------------------------------
Sturec - Inferred Resources
---------------------------
Gold Silver
Cut-off Grade, Grade, Ounces, Ounces,
Grade (g/t) (g/t) (g/t) Tonnes Gold Silver
New Estimate, 2004
--------------------------------------------------
1.0 2.01 16.06 8,367,508 540,733 4,320,487
0.5 1.35 11.32 16,109,256 699,198 5,862,907
Prior Estimate, 1998 by WSE (see below)
--------------------------------------------------
1.0 1.92 13.70 10,651,000 657,480 4,691,395
0.5 1.53 10.91 15,408,000 757,929 5,404,582
--------------------------------------------------
/T/
The re-calculation delivered a 10% increase in overall ounces at
the 1 gram cutoff, as well as a 10% increase in grade and a 114%
increase in tonnes in the indicated resource category.
Background on Current Estimation
Both new and prior estimates reported above are block models
using " Inverse Distance Cubed" as the estimation method. Both
estimates used 5 metre composite intervals and used variograms to
determine spatial continuity. Search ellipsoid sizes were as
follows:
/T/
--------------------------------------------------
New Estimate (2004) Prior Estimate (1998)
--------------------------------------------------
X Y Z X Y Z
(metres) (metres) (metres) (metres) (metres) (metres)
First pass 15 15 7.5 25 25 7.5
Second pass 30 30 10 50 50 10
Third Pass 100 100 20 100 100 20
--------------------------------------------------
/T/
The new estimate is titled " INDEPENDENT TECHNICAL ASSESSMENT
REPORT ON KREMNICA GOLD PROJECT" and was jointly prepared by
Bruce A. Smith, Member AusIMM, MSc Geology, and Garth P. Kirkham
P.Geoph., Kirkham Geosystems Ltd. and filed on SEDAR on February
2, 2004. The co-authors of the new estimate reported there are no
known environmental, permitting, legal, title, taxation,
socio-political, marketing, or other relevant factors that will
materially adversely impact the mineral resource. The co-authors
did not recommend a cut-off grade based on reasonable prospects
for economic extraction and reported resources calculated using a
range of cut-offs from 0.0 to 5.0 grams for comparison.
Tournigan`s Qualified Person Dr. Kent Ausburn, VP Exploration,
has recommended the reporting of both 0.5 and 1.0 gram cut-offs
as prior economic evaluations at Kremnica have suggested an
economic cut-off would fall within this range. The suitability of
0.5 to 1.0 g/t cut-offs is based on the current concept of a
possible bulk-mineable, open-pit operation with average gold
grades of 1.4 to 2.0 g/t gold. The new mineral resource estimate
was designed to more accurately consider critical geologic
parameters such as orientation of ore-controlling structures and
geometry of the mineralized zones. This is reflected, for
example, in the orientation, spacing, and size of search
ellipsoids.
The prior estimate was prepared by Western Services Engineering
Inc. (" WSE" ) in 1998 using the same dataset and similar
methodology as the new estimate. This historical estimate does
not conform to NI 43-101 but Qualified Person Dr. Kent Ausburn,
VP Exploration reviewed this estimate and considers it reasonable
and relevant.
Tournigan is re-compiling historical resource calculations and
target estimates that will assist in the demonstration of upside
potential for Kremnica. This potential, as well as the 2004 work
program, will reported shortly in a separate press release.
TOURNIGAN GOLD CORPORATION
Damien Reynolds, President and Chief Executive Officer
Statements in this press release other than purely historical
information, including statements relating to the Company`s
future plans and objectives or expected results, constitute
forward-looking statements. Forward-looking statements are based
on numerous assumptions and are subject to all of the risks and
uncertainties inherent in the Company`s business, including risks
inherent in mineral exploration and development. As a result,
actual results may vary materially from those described in the
forward-looking statements.
-30-
FOR FURTHER INFORMATION PLEASE CONTACT:
Tournigan Gold Corporation
Damien Reynolds
President
(604) 683-8320
(604) 683 8340 (FAX)
or
Tournigan Gold Corporation
Garry Stock
Executive VP
(604) 683-8320
(604) 683 8340 (FAX)
Email: info@tournigan.com
Website: www.tournigan.com
WKN 898464
diese aktie und die nächsten 100%
vorab das wichtigste der aussagen:
The re-calculation delivered a 10% increase in overall ounces at the 1 gram cutoff, as well as a 10% increase in grade and a 114% increase in tonnes in the indicated resource category.
Übersetzt:
+ 10% Gesamtunzenanzahl
+114% der indicated resources
Das heißt, es liegt deutlich mehr Gold in kremnitz al zunächst vermutet!!!!
Der ausbruch liegt hier sehr nahe.
Tournigan Gold Corporation: Revised Mineral Resource
Estimate at Kremnica
VANCOUVER, BRITISH COLUMBIA--Tournigan Gold Corporation
(" Tournigan" ) has received an independent resource calculation
for the Kremnica gold deposit which highlights the following:
- Higher Grade
- Increase in Indicated Resources
A National Instrument 43-101 Technical Report was independently
prepared using existing data on Kremnica, a historic mining camp
in the Slovak Republic that Tournigan acquired in July 2003. The
resource calculation focuses exclusively on the Sturec Zone,
historically the zone of greatest gold production at Kremnica. A
comparison of Sturec gold resources are as follows:
/T/
--------------------------------------------------
Sturec - Indicated Resources
----------------------------
Gold Silver
Cut-off Grade, Grade, Ounces, Ounces,
Grade (g/t) (g/t) (g/t) Tonnes Gold Silver
New Estimate, 2004
--------------------------------------------------
1.0 2.11 15.43 5,663,941 384,231 2,809,802
0.5 1.49 11.46 9,820,697 470,457 3,618,412
Prior Estimate, 1998 by WSE (see below)
--------------------------------------------------
1.0 1.83 14.2 2,652,000 156,227 1,211,183
0.5 1.51 11.9 3,655,000 177,687 1,396,228
--------------------------------------------------
--------------------------------------------------
Sturec - Inferred Resources
---------------------------
Gold Silver
Cut-off Grade, Grade, Ounces, Ounces,
Grade (g/t) (g/t) (g/t) Tonnes Gold Silver
New Estimate, 2004
--------------------------------------------------
1.0 2.01 16.06 8,367,508 540,733 4,320,487
0.5 1.35 11.32 16,109,256 699,198 5,862,907
Prior Estimate, 1998 by WSE (see below)
--------------------------------------------------
1.0 1.92 13.70 10,651,000 657,480 4,691,395
0.5 1.53 10.91 15,408,000 757,929 5,404,582
--------------------------------------------------
/T/
The re-calculation delivered a 10% increase in overall ounces at
the 1 gram cutoff, as well as a 10% increase in grade and a 114%
increase in tonnes in the indicated resource category.
Background on Current Estimation
Both new and prior estimates reported above are block models
using " Inverse Distance Cubed" as the estimation method. Both
estimates used 5 metre composite intervals and used variograms to
determine spatial continuity. Search ellipsoid sizes were as
follows:
/T/
--------------------------------------------------
New Estimate (2004) Prior Estimate (1998)
--------------------------------------------------
X Y Z X Y Z
(metres) (metres) (metres) (metres) (metres) (metres)
First pass 15 15 7.5 25 25 7.5
Second pass 30 30 10 50 50 10
Third Pass 100 100 20 100 100 20
--------------------------------------------------
/T/
The new estimate is titled " INDEPENDENT TECHNICAL ASSESSMENT
REPORT ON KREMNICA GOLD PROJECT" and was jointly prepared by
Bruce A. Smith, Member AusIMM, MSc Geology, and Garth P. Kirkham
P.Geoph., Kirkham Geosystems Ltd. and filed on SEDAR on February
2, 2004. The co-authors of the new estimate reported there are no
known environmental, permitting, legal, title, taxation,
socio-political, marketing, or other relevant factors that will
materially adversely impact the mineral resource. The co-authors
did not recommend a cut-off grade based on reasonable prospects
for economic extraction and reported resources calculated using a
range of cut-offs from 0.0 to 5.0 grams for comparison.
Tournigan`s Qualified Person Dr. Kent Ausburn, VP Exploration,
has recommended the reporting of both 0.5 and 1.0 gram cut-offs
as prior economic evaluations at Kremnica have suggested an
economic cut-off would fall within this range. The suitability of
0.5 to 1.0 g/t cut-offs is based on the current concept of a
possible bulk-mineable, open-pit operation with average gold
grades of 1.4 to 2.0 g/t gold. The new mineral resource estimate
was designed to more accurately consider critical geologic
parameters such as orientation of ore-controlling structures and
geometry of the mineralized zones. This is reflected, for
example, in the orientation, spacing, and size of search
ellipsoids.
The prior estimate was prepared by Western Services Engineering
Inc. (" WSE" ) in 1998 using the same dataset and similar
methodology as the new estimate. This historical estimate does
not conform to NI 43-101 but Qualified Person Dr. Kent Ausburn,
VP Exploration reviewed this estimate and considers it reasonable
and relevant.
Tournigan is re-compiling historical resource calculations and
target estimates that will assist in the demonstration of upside
potential for Kremnica. This potential, as well as the 2004 work
program, will reported shortly in a separate press release.
TOURNIGAN GOLD CORPORATION
Damien Reynolds, President and Chief Executive Officer
Gutachten der Mineralvorkommen in Kremnica
Wirtschaftsredaktion
VANCOUVER, British Columbia--Die
Tournigan Gold Corporation (" Tournigan" ) ließ von unabhängiger Seite eine
Berechnung der Goldvorkommen in Kremnica erstellen, welche im Wesentlichen
folgende Aussagen enthält:
-- Höherer Anteil
-- Mehr Lagervorkommen
Anhand der bereits vorliegenden Daten über Kremnica, einer
historischen Mine in der Slowakischen Republik, die von Tournigan im Juli
2003 übernommen wurde, wurde von unabhängiger Seite ein technischer Bericht
(National Instrument 43-101 Technical Report) erstellt. Die Berechnung der
dortigen Vorkommen konzentriert sich ausschließlich auf die Zone Sturec, wo,
historisch gesehen, das meiste Gold in Kremnica geschürft wird. Ein
Vergleich der Goldvorkommen in Sturec gestaltet sich wie folgt:
--------------------------------------------------
Sturec - Angedeutete Vorkommen
----------------------------
Gold Silber
Cut-off Gehalt, Gehalt, Unzen, Unzen,
Gehalt (g/t) (g/t) (g/t) Tonnen Gold Silber
Neuschätzung, 2004
--------------------------------------------------
1,0 2,11 15,43 5.663.941 384.231 2.809.802
0,5 1,49 11,46 9.820.697 470.457 3.618.412
Frühere Schätzwerte, 1998 von WSE (siehe unten)
--------------------------------------------------
1,0 1,83 14,2 2.652.000 156.227 1.211.183
0.5 1,51 11,9 3.655.000 177.687 1.396.228
--------------------------------------------------
--------------------------------------------------
Sturec - Abgeleitete Resourcen
---------------------------
Gold Silber
Cut-off Gehalt, Gehalt, Unzen, Unzen,
Gehalt (g/t) (g/t) (g/t) Tonnen Gold Silber
Neuschätzung, 2004
--------------------------------------------------
1.0 2,01 16,06 8.367.508 540.733 4.320.487
0.5 1,35 11,32 16.109.256 699.198 5.862.907
Frühere Schätzwerte, 1998 von WSE (siehe unten)
--------------------------------------------------
1.0 1,92 13,70 10.651.000 657.480 4.691.395
0.5 1,53 10,91 15.408.000 757.929 5.404.582
--------------------------------------------------
Die Neuberechnung ergab 10% mehr Gesamtunzen mit einem Cut-Off von 1
Gram sowie 10% mehr Vorkommen und eine Erhöhung in Tonnen um 114% in der
angedeuteten Resourcen-Kategorie.
Hintergrund des aktuellen Gutachtens
Sowohl die alten als auch die neuen, oben angegebenen Zahlen stammen
aus Blockmodellen, die anhand des Verfahrens " Inverse Distance Cubed"
(Kehrwert der Distanz hoch Drei) berechnet wurden. Beide Schätzungen
verwendeten Kompositintervalle von 5 Metern und Variogramme zur Bestimmung
der räumlichen Kontinuität. Die Größe der Suchellipsoide war wie folgt:
--------------------------------------------------
Neuschätzung (2004) Alte Schätzung (1998)
--------------------------------------------------
X Y Z X Y Z
(Meter) (Meter) (Meter) (Meter) (Meter) (Meter)
Erster Durchgang 15 15 7,5 25 25 7,5
Zweiter Durchgang 30 30 10 50 50 10
Dritter Durchgang100 100 20 100 100 20
--------------------------------------------------
Das neue Gutachten hat den Titel " INDEPENDENT TECHNICAL ASSESSMENT
REPORT ON KREMNICA GOLD PROJECT" (Unabhängiges technisches Gutachten über
das Kremnica-Goldprojekt) und wurde gemeinsam von Bruce A. Smith,
AusIMM-Mitglied, MSc Geology, und Garth P. Kirkham P.Geoph., Kirkham
Geosystems Ltd. erstellt und am 2. Februar 2004 beim SEDAR eingereicht. Die
Coautoren des neuen Gutachtens geben darin an, dass es keine bekannten
umweltbezogenen, zulassungsbezogenen, rechtlichen, steuerbezogenen,
soziopolitischen, marketing-bezogenen oder andere Faktoren bzw. Ansprüche
gibt, welche die Mineralvorkommen in wesentlicher Weise beeinflussen.
Ausgehend von den berechtigten Aussichten auf wirtschaftliche Extraktion und
die berechneten, angegebenen Resourcen empfehlen die Coautoren keinen
Cut-Off, wobei eine Reihe von Cut-Off-Werten zwischen 0,0 und 5,0 Gramm als
Vergleich angesetzt worden war. Der bei Tournigan zuständige
Sachverständige, Dr. Kent Ausburn, VP Exploration, hatte Cut-Offs von 0,5
und 1,0 Gramm empfohlen, da frühere wirtschaftlichen Evaluierungen in
Kremnica darauf hindeuteten, dass ein wirtschaftlicher Cut-Off in diesen
Bereich fällt. Das Ansetzen von Cut-Offs im Bereich von 0,5 bis 1,0 g/t
beruht auf dem derzeitigen Konzept eines möglichen Bulk-Tagebaus bei
durchschnittlichen Goldanteilen von 1,4 bis 2,0 g/t. Diese Neueinschätzung
der Mineralvorkommen zielt darauf ab, wichtige geologische Parameter, wie
beispielsweise die Ausrichtung von erzkontrollierenden Strukturen und der
Geometrie der mineralisierten Zonen, genauer zu berücksichtigen. Erkennbar
ist dies beispielsweise an der Art der Ausrichtung, den Abständen und der
Größe der Suchellipsoide.
Die alte Schätzung aus dem Jahr 1998 stammt von der Western Services
Engineering Inc. (" WSE" ) und wurde mit demselben Datensatz und einer
ähnlichen Methodik wie bei der neuen Schätzung erstellt. Dieses Gutachten
entspricht nicht NI 43-101, wurde jedoch von Dr. Kent Ausburn, VP
Exploration, geprüft und für angemessen und relevant befunden.
Tournigan stellt derzeit frühere Resourcenberechnungen und
Zielgutachten zusammen, um das Renditepotenzial von Kremnica aufzuzeigen.
Dieses Potenzial sowie das Arbeitsprogramm für 2004 wird in Kürze in einer
weiteren Pressmeldung bekannt gegeben.
TOURNIGAN GOLD CORPORATION
Damien E. Reynolds, Vorstandsvorsitzender
Aussagen in dieser Pressemitteilung, bei denen es sich nicht um rein
historische Informationen handelt, einschließlich Aussagen in Bezug auf die
Zukunftspläne und Ziele oder die erwarteten Ergebnisse des Unternehmens,
sind zukunftsbezogene Aussagen. Als solche beruhen sie auf zahlreichen
Annahmen und unterliegen allen Risiken und Unwägbarkeiten in Verbindung mit
dem Geschäft des Unternehmens, einschließlich der Risiken in Verbindung mit
Mineralienabbau und -entwicklung. Als Folge dieser Risiken können die
tatsächlichen Ergebnisse wesentlich von den in den zukunftsbezogenen
Aussagen Beschriebenen abweichen.
Die TSX Venture Exchange unternahm keine Prüfung der Adäquanz oder
Genauigkeit dieser Pressemitteilung und übernimmt daher dafür keine
Verantwortung.
Sollte die Story laufen bzw. der Kurs anspringen kann man immer nochmal rein,
0,30€ morgen ?, kann ich nicht glauben, der Schlußkurs wurde mit 1000Stck zu 0,48CAD$ ausgeführt, ergo 280€, der Rest wurde eher mit 0,27€ gehandelt bzw. 0,45 CAD$
na warten wir mal ab, auch in diesem Film wird es Fortsetzungen geben
Nachkauf lohnt sich heut bestimmt...:)
P.S Freitag, der 13. in Kanada