Thermal sales atm I think are about 3.35mmcf/d @ $16/mcf
Elect gensets 0.75mmcf/d @ $13/mcf (?)
ENEO average ‘minimum’ consumption probably 7mmcf/d
Condensate at 16bbls / mcf. Estimate 11.1mmcf/d in 2015 @$60/bbl
So
3.35 x 1000 x 16 x 365 = $19.56m
0.75 x 1000 x 13 x 365 = $3.58m
7 x 1000 x 9 x 365 = $23m
Condensate 11.1 x 16 x $60 = 3.89m
Total Gross Revenue 2015 estimated at $50 million.
Not too bad as VOG only started continuous production in July 2012. I’ll refrain from predicting how much profit VOG will make, but they will be profitable for the first time in my memory
Bin auch schon mehrere Jahre investiert und immer noch gute 3 Riesen
im Minus.
RS ( 40 : 1 ) na Super, erst 80k und jetzt nur noch 2k Shares.
Das bedeutet, der Kurs müsste knapp 3 Euro erreichen um meine Verluste
auszugleichen, halte ich für unmöglich.
Schönen Gruß
und noch ein erfolgreiches, gesundes neues Jahr ;-)
Victoria Oil & Gas Plc announces that Gaz du Cameroun ("GDC") has completed laying pipeline to the boundaries of the ENEO Power Station properties at Bassa and Logbaba ahead of schedule. The 20 MW Bassa Power Station is located 0.3km from our operating northern pipeline and the 30 MW Logbaba Power Station is located 1.3km along the proposed eastern leg off our main line. The pipeline is currently under test and it is anticipated that testing will be completed by the end of this week.
ENEO requires both power stations to be on line and delivering 50MW by the end of Q1 2015 and GDC anticipates that it will complete all of its deliverables before that deadline