Barents Blue Project short-listed by Enova as Norwegian candidate for EU’s IPCEI Hydrogen
https://live.euronext.com/en/node/4708057  
222 Postings ausgeblendet.
Seite: < 1 | 2 | 3 | 4 |
7 | 8 | 9 | 10 10  >  

576 Postings, 1735 Tage TailorCobainCCUS-Initiative in Nordnorwegen

 
  
    #224
13.02.25 14:20
https://www.sintef.no/siste-nytt/2025/...tikk-nord-norge-startet-opp/

Projektpartner: Horisont Energi, SINTEF AS, SINTEF Helgeland AS, Bellona, ​​​​Elkem, Kvitebjørn Varme, Ocean-Power, Norsk e-Fuel, Mo Industrial Park, Arctic Cluster Team, Hafen von Narvik, Carbon Circle, Pharos Advisors, CLIMIT, Troms County Municipality und Nordland County Municipality.  

6279 Postings, 5261 Tage sonnenschein2010Fertiberia verabschiedet...

 
  
    #225
14.02.25 09:57
https://live.euronext.com/en/product/equities/...ressRelease-12623853

Horisont Energi continues progressing the development of the Barents Blue project as its collaboration with Fertiberia comes to an end  

576 Postings, 1735 Tage TailorCobainWest-australische Regierung zu Besuch

 
  
    #226
14.02.25 21:54
Neuer Player aus "Western Australia"? Dieser Post der Western-Australia-Regierung auf LinkedIn:

"A huge thank you to Haugaland Næringspark / Haugaland Business Park and Horisont Energi for making the time to meet with David B., Dr Francis Norman and myself earlier this week to talk about the exciting plans underway for energy transition in Hashtag#Stavanger.
I look forward to keeping in touch and watching the plans unfold !!

Siri Melberg| Bjørgulf Haukelidsæter Eidesen | Bjarte Børtveit | Elisabeth Gaard Kvale | CODA - Centre of Decommissioning Australia | Invest and Trade Western Australia | Department of Jobs, Tourism, Science and Innovation"  

656 Postings, 1302 Tage Professor ZweisteinJahresbericht Termin

 
  
    #227
16.02.25 14:14
Am 10.04.2025 Jahresbericht. Warum eigentlich so spät? Die anderen machen das alle Ende Februar.  

576 Postings, 1735 Tage TailorCobain@prof

 
  
    #228
16.02.25 17:31
gutes Auge. Weiß ich leider nicht.  

656 Postings, 1302 Tage Professor ZweisteinJahresbericht

 
  
    #229
16.02.25 21:20
Die Zahlen dürften ja schon feststehen. Da bislang keine Fördermittel eingegangen sind, kann man sich das Ergebnis des Jahresabschlusses 2024 schon vorstellen. Q1 2025 Zahlen kommen dann direkt etwa einen Monat später.  

576 Postings, 1735 Tage TailorCobain@prof

 
  
    #230
17.02.25 08:05
ist für mich aber irrelevant. Die Zahlen werden mies sein, da kein Umsatz generiert wird. HRGI wird entweder Pleite gehen oder neubewertet werden müssen wenn etwas ausschlaggebendes wie eine sehr hohe Förderung, Kapitalmaßnahme, Partnerschaft, weiteres Mega-Projekt etc. zustande kommt. Aktuell bewertet der Markt die Aktie sehr nüchtern und geht eben davon aus, dass sie pleite gehen. Wait and see... immerhin haben sie das Term-Sheet für den Gasvertrag hinbekommen und der Ausstieg von Fertiberia lässt nur darauf hoffen, dass es ein notwendiges Übel gewesen ist damit ein anderer industrieller Player einsteigt.  

6279 Postings, 5261 Tage sonnenschein20102024 war es

 
  
    #231
17.02.25 08:27
auch verhältnismäßig spät...

21 Mar 2024
07:30 CET HORISONT ENERGI AS
Horisont Energi publishes annual report and Q4 2023 update  

656 Postings, 1302 Tage Professor ZweisteinPump das Blau

 
  
    #232
17.02.25 11:22
Ich persönlich hoffe, dass Fertiberia sich dem grünen Ammoniak zuwendet und ein paar schöne Elektrolyseure bei Nel beauftragt. Aber das wird man sehen. Horisont Energi ist ein brutaler Zock für das zweite Quartal 2025. Sollten sie nochmal Pump von der EU bekommen kann dieses Ding abgehen wie nichts. Die Chancen sind immerhin besser als beim Lotto 6 aus 49. Wer gerne spielt ist hier gut beraten. Aber ich denke sie bricht nach dem Jahresbericht nochmal schön ein. Bei etwa 5 Cent Anteilswert, hätte ich vielleicht auch Lust auf so ein Spielchen. Ich würde aber nur 500 Euro spaßeshalber in den Topf ohne Boden werfen.  

576 Postings, 1735 Tage TailorCobain@prof

 
  
    #233
17.02.25 12:13
Einen Einbruch kann ich mir kaum noch vorstellen. Der Kurs hat zwar nachgegeben nach dem Ausstieg von Fertiberia, aber bei so einer Meldung hätte es einen größeren Rücksetzer geben müssen. Ich vermute es sitzt fast nur noch der harte Kern im Boot.


HRGI teilt heute auf Linkedin einen Artikel des Stavanger Abendblatts: https://www.aftenbladet.no/okonomi/i/25gExy/...everket-eramet-i-sauda  

656 Postings, 1302 Tage Professor ZweisteinEinbruch

 
  
    #234
17.02.25 12:24
Das war neulich ein Einbruch um 30%. Also das ist schon was in dem Zustand. Wenn jetzt noch ein mieser Jahresbericht obendrauf kommt im April, kann das ganz schön rund gehen. Da wird noch gequetscht was geht. Sollte einen Monat später noch ein mieser Quartalsbericht hinterherkommen klopt der Hammer nochmal obendrauf. Die kann auch auf drei Cent fallen.  

576 Postings, 1735 Tage TailorCobain@prof

 
  
    #235
17.02.25 16:05
bis dahin dauert es aber noch. Ich denke der besagte "strategic review" sollte vorher abgeschlossen sein und ist dann maßgeblich für den Kurs.  

656 Postings, 1302 Tage Professor ZweisteinStrategic review ... ???

 
  
    #236
18.02.25 13:33
Ah … ein „strategic review“ …

Jetzt mal ehrlich: Die Bilder von Barent Blue sind alle computergeneriert und das Bauprojekt befindet sich darauf in keinem durchgeplanten Stadium. Das ist allenfalls ein Vorentwurf, wenn das der gegenwärtige Planungsstand sein soll. Lediglich die Kubatur der Baukörper wird dargestellt, aber vorne ein fetter Tanker dran. Für Investoren gemacht.

Das lässt mich vermuten, dass es vielleicht noch gar keine Baugenehmigung für das Projekt gibt. Norwegen muss vielleicht sogar noch zustimmen, derartige Projekte an der Küste zu bauen. Das liegt vielleicht bei irgendeiner Baurechtsbehörde und wartet, während die alles Mögliche wissen wollen und gegebenenfalls auch nicht verstehen. Hierfür wäre aber eine Formulierung der einzelnen Baukörper notwendig.

Eventuell gäbe es zuerst einen vorhabenbezogenen Entwicklungsplan. Danach dann einzelne Anträge für die Baukörper, sobald die durchgestaltet sind. Es folgen staatliche Auflagen, die eingearbeitet werden müssen. Dann eine komplette Ausführungsplanung und Beschreibung. Verhandlungen mit Baufirmen, bis die Preise stimmen. Erst dann kann es überhaupt losgehen.

Dann diese fette Bodenplatte und die ganzen Fundamente aus WU-Beton in Salzwasserexposition. Obendrauf sensible Silos voll mit Ammoniak direkt an der Küste. Das muss logischerweise stabil gemacht werden. Das Projekt ist jetzt 3 Jahre alt und es sieht aus, als hätte man 3 Monate daran gearbeitet.  
Angehängte Grafik:
horisont-energi.jpg (verkleinert auf 42%) vergrößern
horisont-energi.jpg

576 Postings, 1735 Tage TailorCobainBarents Blue

 
  
    #237
18.02.25 15:18
das liegt alles schon Jahre zurück und es gibt meiner Meinung nach eine Genehmigung. Damals hatte HRGI noch kein Grundstück. Dann kam alles Stück für Stück.

Erst der genaue Ort,
dann die Sicherstellung der Stromversorgung,
jetzt das term-sheet fürs Gas.

Aber klar, entweder die Geschichte ist unausgegoren und deshalb sprang Fertiberia ab, oder es ist (wie kommuniziert) Teil des strategic reviews. Ich kann mir aber kaum vorstellen, dass sich ein Unternehmen wie Fertiberia auf solche Partnerschaften eingelassen hat, indem sie nur ein 3D-Bildchen anschauen.  

576 Postings, 1735 Tage TailorCobainBarents Blue

 
  
    #238
18.02.25 15:23
"Sandnes, Norway – 28 April 2022 – On behalf of Horisont Energi (EURONEXT: HRGI)
and the Barents Blue project, the consulting engineering company Multiconsult
has completed a geotechnical survey campaign at Markoppneset, in the Norwegian
municipality of Hammerfest.

Horisont Energy has selected Markoppneset in Repparfjorden as the most promising
location for the Barents Blue Project. Geotechnical site and nearshore
investigations confirm the site selection and the feasibility of the chosen
site. As part of Multiconsult’s scope, extensive geotechnical onshore and
nearshore soil investigations have been carried out during the winter of
2021/2022, together with seabed mapping nearshore. Geotechnical design studies
of the site were also conducted. The result from the work remains positive,
confirming that the area is fully suitable for the Barents Blue ammonia plant.

“The Multiconsult geotechnical mapping of the Markoppneset site demonstrates
that we are on track with the development of Barents Blue. This gives us the
assurances we need regarding the quality of the factory site,” says Horisont
Energi CEO Bjørgulf Haukelidsæter Eidesen.

A large area of approximately 400.000 m2 is needed for the plant, and
Markoppneset is a suitable location for this purpose, with fairly flat
topography and ample space for future expansion, according to the civil studies
performed by Multiconsult. The location also has solid access road and airport
connections both to Alta and Hammerfest. The area’s proximity also allows for
the needed technical infrastructure and suitable freshwater sources.

Repparfjorden is sheltered, while at the same time providing sufficient space
for manoeuvring, anchoring and waiting for efficient product handling.
Year-round safe marine operations have been demonstrated at the Snøhvit LNG
facility for more than a decade, and this experience and maritime expertise in
Hammerfest document the feasibility and is also expected to provide synergies
for marine operations and tugs for Barents Blue.

“We have been able to provide experience and expertise from all of Multiconsult,
including local engineering knowledge at our office in Alta. Based on our 50
years of experience with terminal projects of this size in Norway, including
Finnmark, we consider Horisont’s choice to provide an optimum site selection for
the Barents Blue project,” says Arnor Jensen, regional director of Multiconsult.


Optimization of site preparation involves management of soil and rock materials
on a large scale. The excavated soil materials must be moved, while all
excavated rock, including those from establishment of tunnels and caverns, will
be reused on-site. Quality rock fill will to a certain extent be brought into
the site to prepare and level the area to the planned elevation.

The plant concept at Markoppneset includes cavern storage of liquid ammonia. The
site is well suited for such storage. Following the findings in the site
surveys, further optimisation studies are planned for cavern storage in the next
phase.

Being planned in cooperation with Equinor and Vår Energi, Barents Blue will
produce ammonia from water, renewable energy, and natural gas, with CO2 being
captured and permanently stored in an offshore reservoir called Polaris. Ammonia
is both a major industrial gas and a potent energy carrier due to its high
hydrogen content which can be used as a fuel directly."

Quelle: Euronext  

576 Postings, 1735 Tage TailorCobainGreen ammonia

 
  
    #239
18.02.25 15:29
@prof,
Ist zwar nicht mehr aktuell, aber zeigt das HRGI auch an grünem Ammoniak Interesse hat. Würde also nicht ausschließen, dass irgendwann mal ein grünes Ammoniak Projekt forciert wird ;)


"SANDNES – March 3, 2022 – Horisont Energi (EURONEXT: HRGI) and the energy
company St1 Nordic Oy invite municipalities in the Finnmark region to discuss
potential locations for a green ammonia plant in Finnmark based on new renewable
energy.

In August 2021, Horisont Energi and St1 announced plans for a pre-study to
explore the opportunities for a green ammonia plant, to develop a concept for a
hybrid ammonia plant which will set a new standard for energy efficiency and
cost efficiency for production of green ammonia. The concept will consist of
hydrogen production from electrolysis from water, and hydrogen production based
on biomass or biomethane.

“We truly believe that Finnmark is one of the best places in the world to locate
facilities to be competitive in the market for green ammonia,” says Horisont
Energi CEO Bjørgulf Haukelidsæter Eidesen.
The facilities can provide positive ripple effects for the host municipality,
including new local and regional jobs and potential synergies with the fish
farming industry utilising biogas.

“We are sending invitations to all municipalities with a coastline in Finnmark.
We hope that this process can crystalise opportunities that fit our needs,” says
Eidesen.
The invitation is sent to the municipalities of Loppa, Hasvik, Alta, Hammerfest,
Kvalsund, Måsøy, Porsanger, Nordkapp, Lebesby, Tana, Gamvik, Berlevåg, Nesseby,
Sør-Varanger, Vadsø, Båtsfjord, Vardø, and Troms and Finnmark county."

Quelle: Euronext  

656 Postings, 1302 Tage Professor ZweisteinGrundvoraussetzung Genehmigung

 
  
    #240
18.02.25 15:37
Die Grundvoraussetzung für eine Genehmigung ist immer die vollständige Erschließung des Grundstückes. Vorher wird nie was genehmigt. Das muss in die Grundbücher und staatlichen Verzeichnisse eingetragen und die bauliche Umsetzung in den Grundzügen vorhanden sein.

Sprich: Gasleitung, Stromleitung, Straßenanbindung, Telekommunikationsanbindung
Wenn noch irgendetwas davon fehlt, ist es noch nicht genehmigt.  

576 Postings, 1735 Tage TailorCobain@prof

 
  
    #241
18.02.25 16:31
dann würde ich daraus schließen, dass dem nicht so ist.
Verhält sich das so auch in Norwegen?  

576 Postings, 1735 Tage TailorCobainBarents Blue

 
  
    #242
18.02.25 16:37
"Sandnes, Norway – 9 March 2022 – Horisont Energi (EURONEXT: HRGI) today
announced that the Barents Blue project has accomplished key milestones during
the last few months to develop the ammonia factory in Hammerfest, Norway. Most
of the technical studies for the concept phase have been submitted to the
project, and Horisont Energi received political approval before Christmas for an
agreement with the municipality of Hammerfest for an option to use the site at
Markoppneset, and a public hearing for the zoning plan has been carried out.

As the operator of the ammonia facility in the Barents Blue project, Horisont
Energi has had a number of technical studies related to the design of the
factory performed. This includes two large concept studies in which the factory
has been specified by Saipem and Technip Engines, in cooperation with the Danish
technology company Haldor Topsoe. In addition, Multiconsult has completed a
study for the necessary infrastructure and preparation of the site. A study of
the gas pipeline for the transport of purchased natural gas to Markoppneset and
the transport of CO2 to the Polaris reservoir has been provided by Subsea 7. An
evaluation of the various alternatives is now carried out in order to make a
final concept decision. Meanwhile, the FEED studies are being prepared for the
next phase of the project, which will lead to a final investment decision.

On 9 December 2021, Hammerfest municipality decided to grant Horisont Energi
(Barents Blue ammonia factory) an option on parts of Hammerfest municipality’s
Markopp property, corresponding to around 75 acres. The option means that a
contract will be signed with the municipality after the zoning plan has been
finally adopted and before the construction of the site is commenced.

The zoning plan is an important step for the Barents Blue project, and final
approval of the regulations must be completed before the preparation of the site
begins. Horisont Energi notified that the zoning process would start and
initiated a public hearing of the proposed zoning plan of the industrial area at
Markoppneset on 21 December 2021. All inputs from the hearing have now been
received, and a total of 20 consultation inputs were received. Horisont Energi
have reviewed the input with our partners and conduct a thorough process to
maintain the project’s further progress.

These are all important milestones for Horisont Energi, leading to the
establishment of the factory. At Markoppneset, the factory will produce blue
ammonia from blue hydrogen, produced from clean water and natural gas with CO2
capture at record high levels, in synthesis with nitrogen separated from air. In
the production process, CO2 will be captured and transported for permanent
storage in the Polaris carbon storage facility off the coast of Finnmark,
Norway. Polaris is set to become the second commercial CO2 storage facility on
the Norwegian shelf.

Barents Blue is a cooperation project with Equinor and Vår Energi."  

656 Postings, 1302 Tage Professor ZweisteinEntsorgung

 
  
    #243
18.02.25 18:57
Das ist zumindest in Europa so. Ich habe die Entsorgung vergessen, die auch zur Erschließung gehört.

Anbindungsmöglichkeit an eine Kanalisation / Kläranlage. Es wird ja Abwasser geben und das muss irgendwo hin.

Gerade ein umweltbewusstes Land wie Norwegen würde eine Genehmigung nicht aussprechen, ohne vorher einen Kanal oder eine Kläranlage sicherzustellen.

Dass da draußen eine Kanalisation ist, wage ich zu bezweifeln. Horisont Energi muss also eine Kläranlage bauen.  

576 Postings, 1735 Tage TailorCobainBullish

 
  
    #244
19.02.25 09:22
Ein Unternehmen, dass CO2 unter dem Meeresboden speichern möchte bekommt es bestimmt hin eine Kläranlage oder Abwasserleitungen zu bauen.

Der "Oberbulle" Nornes Ted Arne knackt die 1 Million Aktien!
Er wird nun mit 1.016.610 Anteilen gelistet. Mal sehen, ob er weiter aufsammelt.

https://horisontenergi.no/en/investor-relations/

 

576 Postings, 1735 Tage TailorCobainstrategic review

 
  
    #245
19.02.25 16:27
Sandnes, Norway – 19 February 2025: At the end of September 2024 Horisont Energi
(EURONEXT: HRGI) (the “Company”) announced a strategic review to explore several
options for its projects within CCS and clean ammonia. Danske Bank Markets was
appointed as financial advisor for the review.

The aim for the strategic review was to identify and evaluate opportunities that
would maximize shareholder value and ensure that the Company is well-positioned
to secure the required funding essential for key project milestones and the
successful execution of its long-term strategy.

The Company has together with its financial advisor conducted an exhaustive and
thorough process towards potential investors. The main take aways from the
review may be summarised as follows:
- The market for green transition projects has experienced a downturn since its
peak in 2021, coupled with a sharp increase in interest rates. Several investors
in this space have shifted towards cash flow-positive businesses.
- The uncertainty related to the green transition, and the change in political
and market sentiment towards green energy solutions is now causing an increased
level of uncertainty within the investor community.

Because of the changes to the market and the investor sentiment, the strategic
review has taken somewhat longer than expected. The strategic review with Danske
Bank Markets has been completed, and despite significant investor interest no
additional financing has been secured. However, the Company is continuing to
pursue remaining investor tracks towards completion.

Progress has however been made on the work streams both for Barents Blue and
Gismarvik CO2 hub, and the Board is of the opinion that the Company and its
shareholders will benefit from the value creation opportunities associated with
each project.

To enable Horisont Energi to reach important project milestones, the Company
will implement actions to extend the capital runway beyond 2025. The Board
therefore has decided to further reduce the costs through additional manpower
reductions. The implementation of the manpower reduction will be effective March
31. The planned level of employees remaining with the Company is 10-15 when the
process is completed, depending on the overall progress of the Company’s
activities.

With these measures, the Board believes that the Company is well positioned to
navigate the current market challenges.

Quelle: Euronext  

6279 Postings, 5261 Tage sonnenschein2010ok

 
  
    #246
19.02.25 18:09
das geht hier in den Winterschlaf mit großer Zahl an Entlassungen, obwohl das Frühjahr vor der Haustür steht. Aber einziger Weg die Firma über die Durststrecke (?) zu bekommen...

Aktuell nicht finanzierbar, ob das EU Geld noch jemals kommt?  

576 Postings, 1735 Tage TailorCobainVorzeitige Sommerpause

 
  
    #247
19.02.25 18:24
oder verlängerter Winterschlaf. Ich leg hier auch erstmal eine Pause ein. Die betriebsbedingten Kündigungen haben vorerst die Überhand gewonnen. Drücke die Daumen das Horisont noch einen neuen Partner findet und sich die finanzielle Situation bis zum Jahresende deutlich verbessert. Das Motto lautet weiter: 0 NOK oder Neubewertung.  

656 Postings, 1302 Tage Professor ZweisteinKlopf Klopf ...

 
  
    #248
19.02.25 19:57
Ich sehe mich irgendwie bestätigt. Geben dem Laden noch bis über die Sommerpause. Jahresbericht und Q1 werden dementsprechend ausfallen, dann die norwegischen Ferien im Juli und August und irgendwann entweder eine Verkaufsmeldung im September oder der Ofen geht einfach aus. Kursziel unter 5 Cent meiner Ansicht nach. Ein positives Signal wäre der Kauf von Anteilen durch einen Mitarbeiter, oder die üblichen Verdächtigen (Simonsen Invest, Spetalen, Ferncliff, Saga Pure, Tycoon Industrier). Wenn einer von denen aufkreuzt in der Aktionärsliste kann man aufhorchen.  