Belo Sun Mining - Brasiliens Golddepot Nr.1
Seite 1 von 2 Neuester Beitrag: 07.03.23 05:16 | ||||
Eröffnet am: | 20.01.14 23:00 | von: HiGhLiFE | Anzahl Beiträge: | 36 |
Neuester Beitrag: | 07.03.23 05:16 | von: sebo2222 | Leser gesamt: | 18.689 |
Forum: | Hot-Stocks | Leser heute: | 6 | |
Bewertet mit: | ||||
Seite: < | 2 > |
www.belosun.com
Belo Sun verfügt über einen finanzstarken Partner und zwar die Forbes&Manhattan Group.
www.forbesmanhattan.com
Deren Chef Stan Bharti, seines Zeichens Milliardär, sitzt im Board of Directors von Belo Sun.
http://www.belosun.com/Corporate/Board-of-Directors/default.aspx
Vorstand von Belo Sun kauft seit Monaten eigene Aktien zurück.
http://www.canadianinsider.com/node/7?menu_tickersearch=BSX+|+Belo+Sun+Mining
Belo Sun notierte letztes Jahr bereits bei ca. 1,80$. Trotz steigender Ressourcenschätzung und Genehmigung der Umweltbehörde, brach der Kurs infolge der Goldschwäche wieder stark ein.
Für mich Grund genug jetzt bei 0,30€ wieder einzusteigen, um den nächsten Anstieg nicht zu verpassen.
ab 3:55 Bericht über BeloSun, einem der aussichtsreichsten Projekte von F&M.
02.20.2014
TORONTO, ONTARIO--(Marketwired - Feb. 20, 2014) - Belo Sun Mining Corp. (TSX:BSX) (the "Company" or "Belo Sun") has completed a Preliminary Economic Assessment (PEA) of a staged development approach based on the updated mineral resource (see press release dated October 3rd, 2013), for its 100%-owned Volta Grande gold project in Para State, Brazil.
The PEA contemplates the construction of a 3.0 million tonne/year processing facility for the first seven years of production and an expansion of the facility to a nominal 6.0 million tonne/year processing facility from Year 9 to the end of mine life. Higher grade material will be processed in the initial years of mine life with lower grade material stockpiled to expedite the project payback. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Preliminary Economic Assessment
Project Data Units Years 1-6 L.O.M
§
Life of Mine Years 21
Average Annual Mining Rate Mtpa 24.8 27.3
Annual Mill Throughput Mtpa 3.0 4.9
Metallurgical Recovery % 94.1% 92.8%
Average Annual Gold Production oz recovered 147,900 167,309
Average Waste to Mill Feed Strip Ratio Waste:Feed 6.32 4.30
Average Waste to Mill Feed Strip Ratio Waste:(Feed+Stockpile) 3.31 4.30
Average Feed Grade (diluted) grams/tonne 1.66 1.14
Mine Operating Costs
Per Feed Tonne
Mining US$/tonne feed 19.27 13.25
Process US$/tonne feed 9.13 8.64
General and Administration US$/tonne feed 3.49 2.22
Total Operating Cost US$/tonne feed 31.89 24.11
Total Operating Cost including Royalties US$/tonne feed 32.53 24.55
§
Per Gold Ounce
Mining US$/oz gold recovered 383 373
Process US$/oz gold recovered 182 279
General and Administration US$/oz gold recovered 69 63
Total Operating Cost US$/oz gold recovered 634 715
Total Operating Cost including Royalties US$/oz gold recovered 647 727
§
CAPITAL COST (including tax) Pre-Production LOM
Initial CAPEX US$ ('000's) 328.7
Sustaining CAPEX US$ ('000's) 104.8
Expansion CAPEX US$ ('000's) 203.6
Mineral Resources
For the PEA, Belo Sun used the October 2013 mineral resource estimate (see press release dated October 3rd, 2013). Mineral resources that are not mineral reserves do not have demonstrated economic viability. External mining dilution is calculated at 12.3% at zero grade. The diluted life of mine mill feed grade will average 1.14 g/t gold with an average cutoff of 0.48 g/t gold. Based on current metallurgical testing, the average gold recovery is expected to be 92.8% overall for the life of mine. The ultimate pit design was based on an optimised pit shell using a US$ 1020 /oz gold price. Internal phases were designed within that ultimate shell. For the purposes of the PEA, only measured and indicated resources were included in the PEA mine design.
VOLTA GRANDE RESOURCES ESTIMATE (OCT 2013) MEASURED INDICATED MEASURED +
INDICATED INFERRED
§
Ouro Verde Pit Constrained Tonnes ('000s) 24,036 20,087 44,123 22,602
§Grade (g/t Au) 1.78 1.61 1.70 1.48
§Ounces ('000s) 1,379 1,037 2,416 1,079
§
Grota Seca Pit Constrained Tonnes ('000s) 31,384 15,671 47,055 18,265
§Grade (g/t Au) 1.61 1.56 1.59 1.59
§Ounces ('000s) 1,620 788 2,408 932
§
Total Pit Constrained Tonnes ('000s) 55,420 35,758 91,178 40,867
(0.5 g/t Au cut-off) Grade (g/t Au) 1.68 1.59 1.65 1.53
§Ounces ('000s) 2,999 1,825 4,824 2,011
(1) Audited mineral resource statement prepared by SRK Consulting (Canada) Inc. The effective date of the audited mineral resource statement is October 1, 2013. Mineral resources are not mineral reserves and have not demonstrated economic viability. All figures have been rounded to reflect the relative accuracy of the estimates.
Open pit mineral resources are reported at a cut-off grade of 0.5 g/t gold. Cut-off grades are based on a number of parameters and assumptions including gold price of US$1,400 per troy ounce, 94% metallurgical gold recovery for weathered and unweathered rock, open pit mining costs of US$1.41/tonne, process costs of US$11.98/ tonne, General and Administrative costs of US$2.89/tonne and selling costs (refining, transport, insurance and environment) of US$ 13.82 per troy ounce.
Mineral resources are constrained within low, medium and high grade domains delineated from drilling data within Ouro Verde and Grota Seca.
The quantity and grade of the reported inferred mineral resources are uncertain in nature and there has been insufficient exploration to define the inferred mineral resources as indicated or measured mineral resources and it is uncertain if further exploration will result in upgrading them to an indicated or measured mineral resource category.
The mineral resources have been classified according to the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards for Mineral Resources and Mineral Reserves (November 2010).
SRK Consulting (Canada) Inc. is not aware of any legal, political, environmental or other risks that could materially affect the potential development of the mineral resources.
Mining
The mine design, mining costs and mining fleet requirements for the Project were prepared by AGP Mining Consultants Inc. The PEA contemplates conventional open pit mining utilizing owner operated trucks and loaders to provide the initial 3.0 million tonnes per year of mill feed. Backhoe support is provided in each of the pits for assistance in grade control. Plant throughput will ramp up from 3.0 million tonnes to 6.0 million tonnes per year starting in Year 8 and reaching full production in Year 9. The ramp up coincides with planned mining equipment replacement. The mine is designed as a two pit operation with multiple phases in each pit mined over 21 years, plus a year of pre-production.
The average waste to mill feed strip ratio for the life of the mine is estimated to be 4.3:1. Bench heights of 10 meters will be mined initially using 14.5 m3 loaders with 97 tonne haul trucks. This provides the greatest flexibility for grade control in the pit and flexibility of operations while maintaining reasonable operating costs and production capability. When the plant throughput increases, the fleet size will also be increased so production can be maintained in a cost effective manner while not sacrificing grade control. The smaller 97 tonne trucks will be replaced with larger trucks carrying 134 tonnes of material. The smaller loaders will be replaced with 19 m3 loaders and 22 m3 shovels. At both production levels, grade control support will be provided with backhoes and reverse circulation drilling.
Mill feed grade has been increased in the initial years using an elevated cutoff to assist with project payback. The lower grade material will be stockpiled near the primary crushing plant and fed to the plant in the later years of the project. Waste rock will be hauled to dedicated waste management facilities adjacent to the open pits. Saprolite feed material will be stockpiled and up to 10% will be fed to the plant annually.
Metallurgy
Based on recent test work completed at SGS Chile, the run-of-mine feed material from the Ouro Verde and Grota Seca open pits feed material is amenable to conventional crush, grind, gravity concentration, CIP / CIL flow sheet. Test work results indicate that 40% to 50% of the gold is expected to be recovered in a gravity concentrate. Overall gold recovery is estimated between 92% and 94% depending on the head grade.
Other test work completed at SGS Chile included Bond work indices, JK drop weight and SMC tests. These results were used to model the Volta Grande grinding circuit and have confirmed that the feed material is amenable to a SAG / ball mill grinding configuration.
Infrastructure
The Project is located in Para State in central Brazil approximately 60 kilometres south-east of the city of Altamira. The climate at Volta Grande is tropical, with a rainy season from January to April and a dry season extending from May to December. The mean temperature is nearly the same (25°C to 30°C) throughout the year. The relative humidity ranges from about 65% to 85%. Access to site will be via an existing 60 kilometer upgraded gravel road. Power for the project will originate from Belo Monte's Pimental distribution station requiring the construction of a 20 kilometer 230 kV high tension power line. Water sufficient to meet mining needs is readily available at the Project site.
In addition to the mine and process facilities, a camp will be established at the project site to house workers on a shift rotation basis. Provision will be made for the storage of critical supplies on site. Mineral resources that are not mineral reserves do not have demonstrated economic viability
§Capital Cost
Pre Production Costs (US$ millions)
Open Pit $12.6
Processing $114.4
Infrastructure $76.0
Indirects, Contingency, Owners Costs $97.3
Subtotal $300.3
Tax $28.4
Total $328.7
§
Post Tax Evaluation Units Base Case Sensitivity
Gold Price US$ Ounce 1300 1450
NPV 0% US$ Million 1,062 1,472
NPV 5% US$ Million 418 637
IRR % 16.1 21.1
Payback years 4.2 3.3
Mark Eaton, President and CEO of the Company, commented, "Belo Sun has completed this study of a staged development approach in order to respond to the current financial environment for large capital gold projects and mitigate against some of the start-up risks of large tonnage projects. With the positive results of this PEA we anticipate using a staged development approach for the execution of the project."
Qualified Persons
The scientific and technical information contained in this news release pertaining to the Project has been reviewed and approved by the following Qualified Persons under NI 43-101 who consent to the inclusion of their names in this release: Dr. Jean-Francois Couture, PGeo and Dr. Oy Leuangthong, P.Eng (Mineral Resource), of SRK Consulting (Canada) Inc., Gordon Zurowski, P.Eng (Mining and Author Technical Report), and Lyn Jones, P. Eng (Metallurgy and Process), of AGP Mining Consultants Inc, each of whom are independent of Belo Sun.
The technical report will be filed on SEDAR within 45 days of the date of this press release. The Company's previous prefeasibility study entitled "Pre-feasibility Study on the Volta Grande Project, Pará, Brazil, NI 43-101 Technical Report" dated June 21, 2013 is no longer current and should not be relied upon.
Forward-Looking Information
This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, without limitation, mineral resource estimates regarding t the conclusions of the PEA and the projected economics of the project, the Company's understanding of the project; statements with respect to the development potential and timetable of the project; production forecast;, life of mine estimates; the estimation of mineral resources; realization of mineral resource estimates; the timing and amount of estimated future exploration; costs of future activities; capital and operating expenditures; success of exploration activities; currency exchange rates; government regulation of mining operations; and environmental risks. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including risks inherent in the mining industry and risks described in the public disclosure of the Company which is available under the profile of the Company on SEDAR at www.sedar.com and on the Company's website at www.belosun.com. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
Contact Information:
Belo Sun Mining Corp.
Mark Eaton
President and CEO
(416) 309-2137
Posted by Scott Davis on Mar 3rd, 2014 // No Comments
Belo Sun Mining logoCanaccord Genuity boosted their price target on shares of Belo Sun Mining (CVE:BSX) from C$0.75 to C$1.00 in a research note issued on Monday, AR Network reports. Canaccord Genuity’s target price points to a potential downside of 4.76% from the stock’s previous close.
Other equities research analysts have also recently issued reports about the stock. Analysts at Scotiabank downgraded shares of Belo Sun Mining from an “outperform” rating to a “sector perform” rating in a research note on Friday, February 21st. They now have a C$0.60 price target on the stock, down previously from C$0.75. Analysts at CIBC downgraded shares of Belo Sun Mining from an “outperform” rating to a “sector perform” rating in a research note on Wednesday, February 12th. Four research analysts have rated the stock with a hold rating and two have issued a buy rating to the company’s stock. The stock has a consensus rating of “Hold” and a consensus price target of C$0.92.
Belo Sun Mining (CVE:BSX) opened at 0.435 on Monday. Belo Sun Mining has a one year low of $0.315 and a one year high of $1.34. The stock’s 50-day moving average is $0.43 and its 200-day moving average is $0.47.
Belo Sun Mining Corp. (CVE:BSX), through its subsidiaries, is a gold exploration company engaged in the exploration of properties located in Brazil.
V.BSX | 4 hours ago
TORONTO, ONTARIO--(Marketwired - Aug. 1, 2014) - Belo Sun Mining Corp. (TSX:BSX) (the "Company" or "Belo Sun") announces that the Federal Court of Appeal in Brasilia (Tribunal Regional Federal) ruled today that the Company's Preliminary License is fully valid and in force. This interlocutory decision overturns the decision from June 2014 made by the Federal Judge of First Level in Altamira (see the Company's press release dated June 26, 2014).
About the Company
Belo Sun Mining Corp. is a Canadian-based mineral exploration company with a portfolio of properties focused on gold in Brazil. Belo Sun's primary focus is advancing and expanding its 100% owned Volta Grande Gold Project, located in Para State. Belo Sun trades on the TSX under the symbol "BSX". For more information about Belo Sun please visit www.belosun.com.
Cautionary Statement on Forward Looking Information
This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, without limitation, statements regarding this ruling and the receipt of all necessary licenses to advance the project, Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including risks inherent in the mining industry and risks described in the public disclosure of the Company which is available under the profile of the Company on SEDAR at www.sedar.com and on the Company's website at www.belosun.com. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
Belo Sun Mining Corp.
Mark Eaton
President and CEO
(416) 309-2137
www.belosun.com
Read more at http://www.stockhouse.com/news/press-releases/...#U5GQ0RRfCVmYISGh.99
V.BSX | 22 hours ago
TORONTO, ONTARIO--(Marketwired - Aug. 18, 2014) - Belo Sun Mining Corp. (TSX:BSX) (the "Company" or "Belo Sun") is pleased to announce additions to its management team in preparation for the advancement of its Volta Grande Project in Brazil. Peter Tagliamonte, previously the Chairman of the Company's Board of Directors (the "Board"), has been appointed as President and Chief Executive Officer, while Mark Eaton, the previous President and Chief Executive Officer, has been appointed Executive Chairman of the Board and will be focusing on arranging financing for the Volta Grande Project. In addition, Joseph Milbourne has joined Belo Sun's management team as Vice-President of Technical Services and will be working closely with Ian Pritchard, Chief Operating Officer, and other members of the Company's technical team on advancing the Feasibility Study and construction planning.
"Mr. Tagliamonte and Mr. Milbourne have extensive experience in all facets of mining, including engineering, permitting, construction and operations; particularly in Brazil and other South American countries," stated Mark Eaton, Executive Chairman of the Company. "Belo Sun will greatly benefit from this wealth of experience as we advance the Company through the next stages of development."
Mr. Tagliamonte commented, "Joe and I have worked together for many years and we are both looking forward to complementing the excellent technical teams that Belo Sun currently has in place both in Canada and Brazil. We are very impressed with the work completed to date and we are focused on quickly advancing the Volta Grande Project to construction."
Mr. Tagliamonte is a professional mining engineer with over 25 years of progressive managerial experience building and operating mines. He was formerly the President and CEO of Sulliden Gold Corporation Ltd. and Central Sun Mining, as well as Chief Operating Officer of Desert Sun Mining, where he was responsible for the development of the Jacobina Mine in Brazil into a 5,000-tonne-per-day underground mining operation. Mr. Tagliamonte was also the Mine Manager for Eldorado Gold at Sao Bento Mine in Brazil. In 2005, Mr. Tagliamonte received the Mining Journal's "Mine Manager of the Year" award in recognition for his work in the mining sector. Mr. Tagliamonte obtained his Mining Engineering degree at Laurentian University in Sudbury, Ontario; he also holds an MBA from the Richard Ivey School of Business at the University of Western Ontario.
Mr. Milbourne is a metallurgist with over 30 years of experience in Central and South America. He has a BS in Metallurgical Engineering from New Mexico Institute of Mining and Technology and a MS in Metallurgy from the University of Utah. He was the former Vice President Operations and Technical Services of Sulliden Gold Corporation, as well as former Technical Director AMEC Mining and Metals where he oversaw process engineering; Mr. Milbourne has international experience with BHP, Eldorado and Cominco. Mr. Milbourne is a fellow of the Australasian Institute of Mining and Metallurgy and a registered member of SME.
Belo Sun is currently working towards the completion of a Feasibility Study for the Volta Grande Project in the fourth quarter of 2014.
About the Company
Belo Sun Mining Corp. is a Canadian-based mineral exploration company with a portfolio of properties focused on gold in Brazil. Belo Sun's primary focus is advancing and expanding its 100% owned Volta Grande Gold Project, located in Para State. Belo Sun trades on the TSX under the symbol "BSX". For more information about Belo Sun please visit www.belosun.com.
Cautionary Statement on Forward Looking Information
This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, without limitation, statements regarding these appointments and the completion of the Feasibility Study.
Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including risks inherent in the mining industry and risks described in the public disclosure of the Company which is available under the profile of the Company on SEDAR at www.sedar.com and on the Company's website at www.belosun.com. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
Belo Sun Mining Corp.
Helia Bento
Marketing Manager
(416) 309-2137
Read more at http://www.stockhouse.com/news/press-releases/...#jLbPvlcruqDbvrYJ.99
falls nicht,kann mir einer sagen, warum die so steigt?
sind es die zahlen?